Princess Margaret Hospital entrusted our team with the renovation of its advanced radiotherapy treatment department, including Vaults 1, 3, and 4, and their MRgRT Suite. Through close collaboration with PMH stakeholders, the design integrated complex and diverse treatment modalities for enhanced clinical efficiency and patient experience.
Vaults 1, 3, and 4, involved the installation of cutting-edge radiation treatment equipment – the Varian Halcyon, TrueBeam Linear Accelerator, and Ethos systems—within a unified, high-performance clinical environment.
The adjacent MRgRT Suite involved the renovation of Vault 2, the MRI scan room, the Brachytherapy Room, alongside thoughtfully integrated control, patient changing, and waiting areas.
- Status: Vault 1 Completed 2023
- Vault 3 and 4 Completed 2024
- MRgRT Suite completed 2025
- Design Builder: Western Medical
- Structural Engineer: Engineering Link
- Mechanical and Electrical Engineers: Quasar Consulting Engineers
